Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Ballesteros-Pérez, P, Skitmore, M, Pellicer, E and Zhang, X (2016) Scoring Rules and Competitive Behavior in Best-Value Construction Auctions. Journal of Construction Engineering and Management, 142(09).

Chan, A P C, Javed, A A, Lyu, S, Hon, C K H and Wong, F K W (2016) Strategies for Improving Safety and Health of Ethnic Minority Construction Workers. Journal of Construction Engineering and Management, 142(09).

Chen, Y, Dib, H, Cox, R F, Shaurette, M and Vorvoreanu, M (2016) Structural Equation Model of Building Information Modeling Maturity. Journal of Construction Engineering and Management, 142(09).

De Jorge Moreno, J, De Jorge Huertas, V and Rojas Carrasco, O (2016) Assessment of the Efficiency of the Spanish Construction Industry Using Parametric Methods: Case Study. Journal of Construction Engineering and Management, 142(09).

Dursun, O and Stoy, C (2016) Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach. Journal of Construction Engineering and Management, 142(09).

Fang, D, Zhao, C and Zhang, M (2016) A Cognitive Model of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 142(09).

Goodrum, P M, Miller, J, Sweany, J and Alruwaythi, O (2016) Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance. Journal of Construction Engineering and Management, 142(09).

Govan, P and Damnjanovic, I (2016) The Resource-Based View on Project Risk Management. Journal of Construction Engineering and Management, 142(09).

Hanna, A S (2016) Benchmark Performance Metrics for Integrated Project Delivery. Journal of Construction Engineering and Management, 142(09).

Hosseini, S M A, de la Fuente, A and Pons, O (2016) Multicriteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas. Journal of Construction Engineering and Management, 142(09).

  • Type: Journal Article
  • Keywords: Post-disaster temporary housing; Sustainability; Site selection; Model for sustainable assessment (MIVES); Multicriteria decision making (MCDM); Analytical hierarchy process (AHP); Quantitative methods;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001137
  • Abstract:
    Many people lose their homes around the world every year because of natural disasters, such as earthquakes, tsunamis, and hurricanes. In the aftermath of a natural disaster, the displaced people (DP) have to move to temporary housing (TH) and do not have the ability to choose the settlement dimensions, distributions, neighborhood, or other characteristics of their TH. Additionally, post-disaster settlement construction causes neighborhood changes, environmental degradation, and large-scale public expenditures. This paper presents a new model to support decision makers in choosing site locations for TH. The model is capable of determining the optimal site location based on the integration of economic, social, and environmental aspects into the whole life cycle of these houses. The integrated value model for sustainable assessment (MIVES), a multicriteria decision making (MCDM) model, is used to assess the sustainability of the aforementioned aspects, and MIVES includes the value function concept, which permits indicator homogenization by taking into account the satisfaction of the involved stakeholders.

Nguyen, L D, Tran, D Q and Chandrawinata, M P (2016) Predicting Safety Risk of Working at Heights Using Bayesian Networks. Journal of Construction Engineering and Management, 142(09).

Ramsey, D, El Asmar, M and Gibson, G E (2016) Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement. Journal of Construction Engineering and Management, 142(09).

Shealy, T, Klotz, L, Weber, E U, Johnson, E J and Bell, R G (2016) Using Framing Effects to Inform More Sustainable Infrastructure Design Decisions. Journal of Construction Engineering and Management, 142(09).

Signor, R, Love, P E D and Olatunji, O (2016) Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach. Journal of Construction Engineering and Management, 142(09).

Wang, C, Zhang, S, Du, C, Pan, F and Xue, L (2016) A Real-Time Online Structure-Safety Analysis Approach Consistent with Dynamic Construction Schedule of Underground Caverns. Journal of Construction Engineering and Management, 142(09).